PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued installing duct work at the 3rd floor Facing North-East.jpg Continued installing the underground electrical roughing at the Boiler Room Facing South-West.jpg Equipment rack at the electrical room 470 Facing North-East.jpg Installe the hot water supply and return at the 2nd floor Facing West.jpg Started framing the lower roof-4th floor at the Courtroom 446 Facing North.jpg
Previous pageNext page Installe the hot water supply and return at the 2nd floor Facing West
Installe the hot water supply and return at the 2nd floor Facing West